Discussing the construction requirements of pine piles
- 2018-04-19-

According tosoftEngineering construction on soil foundationset upofRealitypracticeexperience,softsoil baseddesignmust be done beforeMust admitrealEnterconstruction sitequalitySurveying and Geotechnicaltest.onlycheckClear the soillayerand soilqualitysituation, in order to correctlyEnterOKdesignand construction;Furthermore, mustMustfromfieldsoil of earthlayerand soilqualityThe characteristics ofhair,rightfoundation and basefoundationofKnotstructure, construction and use, etc.EnterOKComprehensivejoint examinationconsider,PassPassPlan ratiocompare,reasonablychoosefoundationatmanagement plan.

Generally, the thickness of soft soil is less than5mIt is more suitable to usepine wood pileIn order to facilitate pile driving, the pile length should not exceed4m.When making end-bearing piles, in order to ensure that the tip of the pile can enter the bearing layer, the upper part can be excavated to the burial depth of the foundation before driving the pile. The material of the pile must be pine, because pine is rich in rosin, which can well It prevents corrosion by groundwater and bacteria and is relatively cheap.

  pine wood pileSuitable for working below groundwater. It is not suitable for use in areas where the groundwater level changes greatly or the groundwater is highly corrosive.pine wood pile.

  Practice has proved that when short wooden piles are used to deal with weak foundations, they have the advantages of convenient construction and obvious economic benefits. They can avoid a large amount of earth excavation. Therefore, they are used in areas with abundant pine wood resources.pine wood pileIt is economically and technically feasible to deal with weak foundations, and it can be regarded as an effective means to deal with weak foundations.

pinepileGenerally, it is arranged in a plum blossom shape or square shape.between pilesThe distance should not be less than3timespilediameter, averagefor500-700mm.pinepileThe driving method is used for construction. Depending on the driving method, it is generally divided intoforManual wood cuttingpileand mechanical wood cuttingpile.commonly usedpileMachines have handsshakerollYangengine and dieselpilemachine, liquidpressExcavator alsothroughCommonly used for breaking woodpile.Use liquidpressExcavator digging woodpile timeneed2people supportpileGet in position and pour the bucket downPassCome and bucklepressWoodpile,Jiang Mupile pressureEntering the foundation to a certain depthstable,helppileThe person walks away and is picked up by the excavatorpinepilepressGo down, normal3 5minTake onepinepile,ergonomic efficiencycomparehigh.formakesqueezeThe density effect is good and the foundation bearing capacity is improved.loadforce, hitpile timeIt is advisable to apply 4 weeks from the base inward. Finishpilebackansweraccording todesignelevationsawflatpile head, clear excavationpile of questionsunearthed.inPile top laying20-750pxthick sandgravelmattresscushion, and addcompaction,after thatpourbuildcushionbasefoundationconcrete.woodReturn the pileOne requirement is anti-corrosion. Generally, coating is usedLikGreen's method.


Shanghai Lanxiao Industrial Co., Ltd.

contact us

    Contact person: Lin Jianhong
    Phone: 13918478586

    QQ:371225501

    WeChat:15921183117
    Email:371225501@qq.com
    Address: No. 8365, Chuannanfeng Highway, Fengxian District, Shanghai

Mobile