piling wood

piling wood

Product Details

Obtainpine wood pile.

1. You can go to the timber market to purchase

2. You can cut down the pine wood yourself and then use a saw to cut it. Before sawing, you need to measure the length of each section. (You cannot saw the pine wood in half into half cylinders in order to increase the quantity)

Note: The obtained pine stakes are slightly longer than the designed pine stakes.

deal withpine wood pile.

a. The top of the pine pile needs to be sawed flat. When sawing, it should be sawed according to the design height (it can be slightly longer).

b. The small end of the pine stake can be cut into a 30cm long tip.

c. The pile body must be specially protected during transportation and construction, and the pile head can be tied with iron wire.


Determine the length of the pile (key). If the pile is too long or too short, it may affect the overall effect. Before driving the pile, you can use a wooden pile to test the place where the pile is to be driven to determine the length of the pile in each area. Actual use The pile length is 0.5cm longer than the test pile.

Prepare pine piles of the required sizes in each area of ​​the construction according to the design drawings, and determine the pile positions for driving the pine piles. (If you want to dig, the excavator can already start digging at this time.)

The last step is to drive the pine piles corresponding to the length of the pile into the soil according to the pile position.

1. If the soil is soft, use the back of the excavator bucket to compact the soil.

2. After the soil bag is stable, you can use the back of the excavator bucket to drive the wooden piles vertically into the bearing layer or use a pile driver to lift the wooden piles into place, and then drive them vertically into the bearing layer manually.

a. The vertical allowable error should be less than 1 percent.

b. The pile top elevation deviation is between -20 plus 20

c. The pile position deviation is between 1\/61\/4

d. When driving piles, drive piles from outside to inside to prevent displacement.

3. Consider playing wellpine wood pileThe upper end is prone to horizontal displacement, so a stone layer is usually laid between the pine wood piles for reinforcement.

Inquiry
Shanghai Lanxiao Industrial Co., Ltd.

contact us

    Contact person: Lin Jianhong
    Phone: 13918478586

    QQ:371225501

    WeChat:15921183117
    Email:371225501@qq.com
    Address: No. 8365, Chuannanfeng Highway, Fengxian District, Shanghai

Mobile