Introduction to construction methods of round wood piles
- 2020-12-21-

The construction of round wood piles is mainly divided into 6 steps. What are the specific steps? Let’s introduce them below.

1. Purchase and storage:

1. Round wooden piles are mainly purchased in the local market and transported to the construction site warehouse by car. When purchasing wooden piles, attention should be paid to the location of the wood. The pile length is slightly longer than the designed pile length. The round wooden piles used must be of uniform material and must not be excessively bent. Under such circumstances, the pile body must not have holes, cracks or other defects that are sufficient to impair the strength.

2. When lifting, loading, unloading, and stacking timber, the pile body must not be subject to impact or vibration to avoid damage to the pile body. The wooden piles should be used in the order they arrive at the construction site. At the same time, the pile bodies should be checked for completeness. The pile storage area must be It should be solid and flat, and there should be no subsidence to avoid deformation of the wooden piles during storage.

2. For piling money, the top of the pile must be cut and smoothed first, and the pile body must be protected from collision scars. The pile head should be tied tightly with iron wire.

3. Production of wooden piles:

1. The diameter of the pile is strictly controlled according to the design requirements, and the shape is straight and smooth.

2. The small end is sharpened to facilitate driving into the force-bearing layer.

3. When more than 80% of the total number of piles is ready, the pile driver will be transferred for construction to avoid the pile driver stalling.

4. Place the prepared piles in place according to different sizes and usage areas to prepare for piling.

5. It is strictly prohibited to use other wood instead of pine.

4. Measurement and setting out: Before the construction of round wooden piles, surveyors will set out according to the design drawings, determine the location of each wooden pile, and mark it with measuring wooden piles.

5. Pile driving by pile driver.

1. Select round wooden piles with the correct pile length, straighten the pile position, and drive according to the design requirements.

2. Drive the log piles into the depth required by the design, ensuring that they are driven vertically into the bearing layer.

3. Strictly control the density of piles to ensure that they meet design requirements.

6. Piling quality requirements:

1. The pile position deviation must be controlled within the range of less than or equal to D\/6-D\/4, and the allowable deviation of the verticality of the pile is less than or equal to 1 percentage.

2. When driving piles, if you feel that there is no obvious holding force when the wooden piles are driven into the soil, you should report it to the design and supervision unit in time.

3. Piles should be driven symmetrically from the outside to the middle, but the pile position must be severely moved.

4. As shown in the design drawing, mark the planned location of the wooden piles on the ground, and the piles can be driven only after passing the inspection by the supervision engineer.

We have introduced to you the construction method of round wood piles. We hope it can bring you some help. If you need to know more related product information, you can leave us a message or call us for consultation.

Shanghai Lanxiao Industrial Co., Ltd.

contact us

    Contact person: Lin Jianhong
    Phone: 13918478586

    QQ:371225501

    WeChat:15921183117
    Email:371225501@qq.com
    Address: No. 8365, Chuannanfeng Highway, Fengxian District, Shanghai

Mobile