Introduction to the construction methods of fir piles
- 2021-01-08-

According to the different piling methods of fir wood piles, it can be divided into manual piling and mechanical piling. Commonly used piling equipment includes hand winches and diesel pile drivers. Hydraulic excavators are also often used to drive wood piles.

When using a hydraulic excavator to drive piles, two people are required to hold the piles in place. Turn the bucket upside down to hold down the wooden piles. Press the wooden piles into the foundation to a certain depth to stabilize themselves. Then let the pile helpers go away and the excavator will push down the fir piles. , generally one pile can be driven every 3-5 minutes, and the work efficiency is high.

In order to achieve a good squeezing effect and increase the bearing capacity of the foundation, piles need to be driven from the 4th perimeter of the base to the inner ring. The shape of the piles is preferably plum blossom shape, and the distance between piles should not be less than 3 times the pile diameter.

After piling, the pile heads should be sawn flat according to the planned elevation to keep the top of each pile at the same level. The silt squeezed out during piling should be excavated, and a 20-30cm thick graded sand and gravel mattress should be laid on top of the fir piles. Compact it, and then pour the base concrete to ensure that part of the load is transmitted to the soil between the piles through the mattress layer, and to adjust the pipe-dividing effect between the piles and the soil.

Setting up a mattress layer under the foundation can reduce the pile-soil stress ratio and give full play to the role of the soil between piles, which can increase the value and reduce the stress concentration on the bottom surface of the foundation.

By changing the thickness of the mattress, the thinner the mattress that adjusts the vertical load of the pile, the higher the load the fir piles bear as a percentage of the total load, and vice versa. If there is no mattress, the soil between the piles cannot be used. Effect.

Shanghai Lanxiao Industrial Co., Ltd.

contact us

    Contact person: Lin Jianhong
    Phone: 13918478586

    QQ:371225501

    WeChat:15921183117
    Email:371225501@qq.com
    Address: No. 8365, Chuannanfeng Highway, Fengxian District, Shanghai

Mobile