Shanghai Lanxiao Industrial Co., Ltd.

 

Banner
Home > news > Content
How to construct pine piles in water level construction?
- 2021-02-21-

We all know that pine piles are commonly used in water level construction projects, but do you know how pine piles are constructed?

When constructing pine piles, hammer driving is used, and the original soil in the pile hole position is forced to be kneaded laterally, which increases the density of the soil layer within a certain range around the pile and plays a squeezing effect.

Its commonly used construction methods are: manually stabilize the pine wood piles, and use an excavator to press the pine wood piles down further. This is its common construction method. Extended foundation is a common bridge infrastructure method because of its simple construction and low cost. It is cheap and widely used. However, its application conditions are also relatively harsh, especially the foundation that supports it. It must first have sufficient bearing capacity. If the bearing capacity is insufficient, it will lead to settlement of the extended foundation. In severe cases, it will lead to the bridge Collapse; secondly, it must be stable and reliable, and the place where the water flow washes is obviously not suitable for selection, otherwise the soil under the foundation will be hollowed out, causing the bridge to collapse.

The rows of wooden piles under the extended foundation are generally called pine piles. This is because pine piles have better durability under proper maintenance conditions; and pine piles are made of "logs" and do not need to be sawed into other pieces. The shape of the pile should not be cut in half to form a semi-circle. The semi-circular pile will soon be strongly bent and lose its effect.

Shanghai Lanxiao Industrial Co., Ltd.

contact us

    Contact person: Lin Jianhong
    Phone: 13918478586

    QQ:371225501

    WeChat:15921183117
    Email:371225501@qq.com
    Address: No. 8365, Chuannanfeng Highway, Fengxian District, Shanghai

Mobile