Shanghai Lanxiao Industrial Co., Ltd.

 

Banner
Home > news > Content
Construction structure form of fir wood piles for river piling
- 2020-06-15-

River piling fir wood piles are a kind of wooden pillar used to protect rivers. They can tighten the river soil and have this active function in preventing soil erosion. So how should river piling fir piles be used?

Construction of various riverside buildings. Another major function of piling cedar piles in rivers is to construct various waterside buildings, giving them a bearing point and ensuring that they can last for a very long time. It is durable and does not rot, so when driving fir piles in rivers, plants and trees such as fir piles and pine piles are generally selected. They have better anti-rot properties and are suitable for use in this kind of natural environment.

1. Overview of this river piling fir wood pile construction project:

River water conservancy project slope protection project

2. Construction structure form of fir wood piles for river piling:

According to the design, the river slope protection needs to use fir pile slope protection solutions. Use an excavator to drive the fir piles to the ground and expose the river surface 1001080x.

3. The river piling fir pile slope protection plan to solve the weak roadbed plan was selected

The soft soil system composed of sludge, sludge silt, collapsible loess, etc. is called soft soil system. The soft farmland foundation is composed of soft soil system. The soft farmland foundation on the embankment must be reinforced or improved with fir piles in accordance with regulations. The load-bearing range ensures the stability of weak farmland. During operation, there are many cases where fir piles are mainly used in general river slope protection projects.

4. Design solution for river piling fir wood pile pavement construction

The diameter of fir piles used for piling in rivers is 12cm and the length is 4 meters. Plum blossom piles are used for piling.

5. Solution to river piling and fir pile road construction

(1) First dig out the gravel at the upper end, and then carry out the fir pile driving construction. During fir pile construction, the fir pile must be stabilized and piped to the old soil layer.

(2) After the river piling is completed, the river ground will be paved and landscaping will be planted.

The above is all the content about driving fir piles in rivers. Follow this site and there will be articles to share in the future.


Shanghai Lanxiao Industrial Co., Ltd.

contact us

    Contact person: Lin Jianhong
    Phone: 13918478586

    QQ:371225501

    WeChat:15921183117
    Email:371225501@qq.com
    Address: No. 8365, Chuannanfeng Highway, Fengxian District, Shanghai

Mobile