According to different foundation piling methods, they can be divided into manual service piles and mechanical equipment piles. Common pile drivers include manual cranes and diesel pile drivers. Hydraulic excavators are also commonly used for foundation piling. When using a hydraulic excavator for foundation piling, Two people must support the pile in time and turn the bucket back to buckle the fir pile.
The piles are driven into the foundation, which must be deep and self-stable. Then let the pile driver leave and use an excavator to press down the fir piles. Usually one pile is driven every 3-5 minutes. The work efficiency is high to improve the quality of the roadbed. To consolidate the effect and increase the bearing capacity, the piles must be released from near the base to the inner ring.
The pile position should be in the shape of a red plum blossom, and the pile spacing should not be less than 3 times the pile diameter. After the piles are stacked, the pile heads should be sawed at an orderly design to maintain the pile top foundation of each pile at the same level, eliminating the need for pile cutting. Extruded sludge, and pave a 20-750px thick sand and gravel cushion on the top of the pile. After compacting, pour it into the road concrete to ensure that the roots migrate to the soil between the piles according to the foundation cushion to adjust the pile and soil. effect.
Set a foundation cushion at the root to reduce the pile-soil stress ratio and make full use of the soil between the piles to increase the value and reduce the bottom stress at the root. After changing the foundation cushion thickness, adjust the pipeline foundation cushion to be thinner , to adjust the parallel line load of the pile, the higher the percentage of the pile load in the total load, and vice versa.
If you choose a fir pile wood board, you can smell the wood board. If there is a pungent smell, don't buy it. This may be the use of residual glue from the wood board, which has high formaldehyde emissions and is harmful to the body. harm.
An important feature of pine board is the expansion and contraction of the wood. Under dry conditions, the wood will bend, shrink and crack; in a humid and cold environment, the wood will expand. Therefore, the wood will expand during processing or Before use, drill holes to bring them close to the equilibrium moisture content consistent with the relative humidity of the air.
The editor has introduced the construction method of fir piles to everyone. For more information, please call the customer service of this site.
Related News
- What is the principle of bearing capacity of pine piles?
- Application of Beijing fir poles
- The fir tree of the fir tree is actually full of Chinese medicine
- Pine wood piles deal with weak foundation and adapt to conditions
- Pine wood pile driving material to deal with weak foundation and adapt to conditions
- What is the original reason why fir wood piles are dry and cracked?
- Where pine stakes are suitable
- How to store fir wood piles
- Fir wood pile purchasing requirements
- How to drive pine stakes
- Introduction to construction methods of river wooden piles
- River wooden piles price
- Performance of pine piles and matters needing attention when using them
- How to construct pine piles
- What issues should you pay attention to when using pine piles?
- What are the regulations for construction of pine piles?
- Zhejiang fir wood pile manufacturer introduces you 4 ways to store wood piles
- Basic knowledge of driving pine piles in soft soil foundation
- A simple and detailed introduction to the construction methods of pine pile engineering
- Where are pine stakes suitable for use?