How to properly construct pine piles
- 2023-03-17-

Pine wood piles are very common in life. Because the raw material is fir, it has rich nutritional value of turpentine. Turpentine can prevent corrosion by bacteria and water. Therefore, in daily life, most people go to the river to lift them to solve the problem of soft foundation. Question. So what are the construction regulations for pine piles?

Pine piles are generally arranged in a plum blossom shape or square. The distance between piles should not be less than 3 times the pile diameter, which is generally 500-700 mm. Pine piles are constructed using the driving method. According to different fighting methods, they are generally divided into manual services and mechanical equipment.

Common foundation piling machinery and equipment include hand cranes, diesel pile drivers, etc. Hydraulic excavators are often used for piling. When using a hydraulic excavator to drive piles, two people should hold the piles in place, turn the bucket back to press the piles, and press the piles into the foundation. After a certain depth is stabilized, leave the pile aid and use an excavator to press down the loose piles.

Generally, it takes 35 minutes to loosen piles and the labor efficiency is high. In order to make the compaction easier and improve the bearing capacity, the foundation must be driven from the periphery of the base when driving piles. After driving the piles, the pile heads are sawed flat according to the designed elevation, and the piles are dug to squeeze out cultural relics. . A 2030cm thick gravel cushion is laid on top of the pile and compacted in all aspects, and then the foundation cushion is poured with foundation concrete. There is also a rule for piles, that is, anti-corrosion, and the method of paint cleaning is generally used.

The above are the construction regulations of pine piles introduced to you. Shanghai Lanxiao Industrial Co., Ltd. wholesale supplies fir piles, river revetment fir piles, river piling fir piles, greening fir piles, fir logs, fir logs, piling wood, fir poles, fir wood. Sticks, log piles, greening poles, support poles, specializing in providing convenient, high-quality, and honest services for water conservancy projects, river piling, road greening projects, etc. In addition, we also wholesale construction square timber, square materials, and construction timber squares for construction projects. Hemlock squares, pine squares, larch squares, Douglas fir squares, etc.


Shanghai Lanxiao Industrial Co., Ltd.

contact us

    Contact person: Lin Jianhong
    Phone: 13918478586

    QQ:371225501

    WeChat:15921183117
    Email:371225501@qq.com
    Address: No. 8365, Chuannanfeng Highway, Fengxian District, Shanghai

Mobile